Scenes from 20 Sewells Road
DAY 233:
Saturday June 26, 2004
Pile of bricks (for the
exterior walls of
the building).
View of southeast
wing, from above.
North wing floors
going up.
The ever-growing
elevator shaft.
Making walls?
Second floor of the
north wing section.