Scenes from 20 Sewells Road

DAY 478:  Saturday February 26, 2005


 

Kitchen cupboards Cupboards and lights Wires and cupboards
Newly installed kitchen
cupboards in three-bedroom unit.
Kitchen area of one-bedroom
unit (notice the three different
types of lights...)
Kitchen cupboards waiting to be
installed, and - look closely -
lots of wires draped over them.
Doorways Hallway lights Bathtub
Painted trim around
doorways.
Lights in unit hallway. Shiny new bathroom!
     
Living room Unit entrance door Bedroom
Looking at the living room from
the kitchen in one-bedroom unit.
Same unit, looking the other way.
One of the first units with the
entrance door installed.
One of the smaller bedrooms
in a four-bedroom unit.
Heater Thermostat Building hallway
Heater in living room of
four-bedroom unit.
Thermostat of the same unit. A rather messy third
floor hallway...
Community room doors Garbage room Air conditioning unit
Looking back at one of the
sets of entrance doors to
the community room.
This is what's at the bottom
of the garbage chute.
Air conditioning unit on the roof,
southeast end.
Southeast end View from roof Back of site
Southeast end of site. View of the north wing, east
side, from the roof.
Back of site.