Scenes from 20 Sewells Road

DAY 395:  Sunday December 5, 2004


 

New curbing More curbing Curbing and concrete
Newly poured curbing at
entrance of 20 Sewells Road.
More new curbing,
mid-site.
Curbing and poured
concrete at north end.
Elevators Rear entrance area Rotunda
Elevator doors are
now installed!
Circle window above rear
entrance doors.
Curved wall of rotunda
near main entrance.
     
Patio steps West side Front of building
Back patio area,
with steps.
West side wall. Preparing for brickwork
on front of building.
     
North end wall Roof, looking west Roof, beside elevator shaft
Brickwork is complete
on north end wall.
Up on the roof, with
sunset in background.
Still on roof, beside elevator
shaft, looking north.